Automatically arrange the drawings into predefined scales. Although there are more steps, the completion time is faster. Multiple drawings can be arranged at the same time
Efficiency through simultaneous arrangement of multiple drawings
Total time reduction is 3 mins. (5 min →2 min) Effects proportional to number of drawings
Unified scale management for multiple drawings
Drawing quality standardization and management efficiency improvement
40% time reduction, quality unification